GC & developer packages · Five boroughs
Working with general contractors and developers in New York City
Clear Division 07 scope breakdowns, prompt submittals, self-performing crews and realistic cold-weather and access planning for NYC commercial and multi-family builds.
Updated November 2026
What our NYC EIFS bid proposals include
Estimators and project managers pricing a New York City exterior package need a proposal that lines up with the architectural specification sections rather than a vague lump sum. When you send us architectural elevations, wall sections, window details and Division 07 specs, we break out our scope clearly so you can level bids without guesswork:
- Clear scope boundaries: Explicit inclusions and exclusions covering fluid-applied air and water barriers, rough-opening liquid flashing, EPS continuous insulation thickness, standard versus high-impact reinforcing mesh zones, field-applied EIFS, prefabricated EIFS panels, perimeter backer rod and joint sealants, and specialty architectural coatings.
- Value alternatives on request: Separate add or deduct lines when a project team wants to compare field-applied EIFS against shop-built panels on zero-lot-line walls, or evaluate single-source barrier-plus-EIFS pricing.
- Weather and sequencing notes: Realistic crew production assumptions tied to hoist schedules, window installation dates and the 40 °F-and-rising temperature floor for wet exterior coats unless heated enclosures are carried by the project.
Shop coordination, color samples and field mockups
Most envelope delays happen between contract award and first board on the wall. Once awarded, we submit manufacturer product data sheets, color and texture drawdown samples, and transition detail markups showing how rough-opening flashing, starter tracks, expansion joints and roof-wall kick-outs tie together. Where specifications call for an on-site mockup panel or sample wall bay, our crew builds the full layered mockup—barrier, ribbon adhesive, foam, mesh, base coat, finish and sealant bead—for architect and consultant sign-off before production runs across the elevation.
Scaffold, lifts, swing stages and site logistics
Access drives both schedule and safety on five-borough jobsites. Our own crew erects and dismantles pipe scaffold for low- and mid-rise elevations, courtyard walls and residential re-clads. Where a building calls for boom lifts, scissor lifts, mast climbers or suspended swing stages, we work from rented equipment or owner- and GC-furnished access systems, coordinating tie-ins, sidewalk protection and material deliveries with your site superintendent. Building permits, street or sidewalk permits, and engineering filings are handled with the owner's and general contractor's project team.
Insurance, public-work registration and crew background
New York City EIFS Contractors is operated by The Dom Construction Group LLC out of Albany, NY, with crews traveling into Manhattan, Brooklyn, Queens, the Bronx and Staten Island for contracted scopes. We carry general liability, umbrella and workers' compensation insurance and furnish certificates of insurance on request. The Dom Construction Group LLC is registered on the New York State public work contractor registry and has completed competitively bid public contracts—such as the 2026 EIFS canopy refinish at Casey Stadium, University at Albany—alongside commercial work like our 2026 prefabricated EIFS panel band on State Street in Schenectady and Shake Shack feature panel finish in Clifton Park. Our field team brings roughly 19 years of trade experience, including years of prior NYC team experience installing tall-building EIFS from swing stages and scaffold such as a full EIFS facade in Long Island City in 2021–22 (team experience under a prior contract). Send your bid invite or call (929) 209-3122.
Subcontract workflow for NYC project teams
Built around clean buyout, predictable submittals and coordinated jobsite mobilizations.
Send architectural PDFs and Division 07 specs
Share elevations, wall sections and target dates; we confirm bid coverage within one business day.
Receive a leveled, itemized proposal
Base bid and alternates clearly separate barrier, field EIFS, prefab panels, high-impact mesh, sealants and access.
Approve submittals, samples and mockup bay
We turn around product data, physical texture samples and on-site layered mockups ahead of field mobilization.
Mobilize insured crews on your hoist or scaffold plan
Our Albany-based installers coordinate substrate sign-offs, window handoffs and daily lift or stage access with your superintendent.
Subcontracting and bidding questions
What drawings and documents do you need to price an EIFS bid package?
For an accurate subcontract bid, we look for architectural floor plans, exterior elevations with finish tags, wall sections, window and parapet detail sheets, and the Division 07 specification sections for EIFS, air-water barriers and joint sealants. Knowing the target start quarter and whether scaffold, hoists or mast climbers are provided by the general contractor lets us separate access costs cleanly.
Who supplies pipe scaffold, lifts or swing stages on your NYC jobs?
We handle access flexibly to match how your site is set up. Our own crew erects pipe scaffold where ground bearing and lot lines allow, and we rent boom or scissor lifts directly when independent lift access fits best. On taller buildings where the general contractor provides shared mast climbers, exterior hoists, sidewalk-shed scaffold or swing stages, we price labor to work off your equipment.
Are you registered for New York State public work contracts?
Yes. The Dom Construction Group LLC is registered on the New York State public work contractor registry and is experienced with prevailing-wage schedules, public-work payroll reporting and agency submittals. In 2026 we completed a competitively bid public contract at the University at Albany's Casey Stadium that included refinishing the South Gate EIFS canopy.
What insurance coverage does The Dom Construction Group carry?
We maintain commercial general liability, umbrella liability and New York workers' compensation insurance, and we provide certificates of insurance upon request during contractor prequalification or contract award. Because our own crews perform the EIFS, panel, barrier, flashing and sealant work directly rather than brokering labor out, crew supervision and jobsite safety stay under our direct management.
Can you bundle cement stucco, stone veneer or sealant scopes with EIFS?
Yes. Mixed-use and residential buildings frequently pair upper-story drainage EIFS with ground-floor stone veneer, three-coat cement stucco, architectural coatings and window perimeter sealants. Bundling those exterior finishes with our air and water barrier crew simplifies buyout, eliminates transition gaps between podium and upper-tower trades, and keeps one subcontractor accountable for facade dry-in.
Upload bid documents or invite us to price your scope
Share your project name, bid due date, plan-room link or elevation snapshots.
Trade packages you can combine
- Field-applied drainage EIFS
Continuous exterior EPS insulation and textured acrylic finishes.
- Prefabricated EIFS panels
Shop-finished panels for winter schedules and zero-lot-line walls.
- Fluid-applied air-water barriers
Single-source substrate prep, opening flashing and weather barrier.
- Company credentials
Insurance, NYS public work registration and team background.
Putting together a facade buyout in the five boroughs?
Book spring work now. Winter assessments and estimates available.