Facade restoration & siding · New York City
Exterior facade restoration and siding replacement in NYC
Most weathered NYC buildings mix brick returns, stucco courts, EIFS bands and rear-elevation siding on the same footprint. Putting one exterior crew on the whole shell closes leaks faster and eliminates trade handoff gaps.
Call or text (929) 209-3122
Book spring work now. Winter assessments and estimates available.
Updated November 2026

Short answer
New York City EIFS Contractors restores multi-material facades and replaces damaged exterior siding for general contractors, developers and property owners across the five boroughs. Our own crews cut out wet EIFS and stucco, strip and replace failing siding, rebuild sheathing and flashings, and recoat elevations.
Key facts
- Service area
- All five boroughs of New York City: Manhattan, Brooklyn, Queens, the Bronx and Staten Island.
- Season
- EIFS and stucco finishes need about 40 °F and rising, with no freezing for 24 hours. In New York City that means roughly April through November.
- Who does the work
- Our own crews, from The Dom Construction Group LLC.
- Insurance
- General liability, umbrella and workers' compensation insurance; certificates on request.
- Estimates
- Free. Start with 3–5 photos by text, or use the form.
- Reply
- We reply within one business day, Monday to Friday.
One exterior crew across mixed NYC facade materials
Very few existing commercial, mixed-use or multi-family buildings across the five boroughs wear a single cladding material from sidewalk to roof bulkhead. A typical Brooklyn, Queens or Bronx building may combine street-facing masonry piers, synthetic stucco spandrels, cement plaster light courts, and lap or panel siding along rear extensions and upper setbacks. Splitting that repair package across separate plaster, siding and caulking subcontractors drags out mobilization schedules and leaves nobody accountable where assemblies meet. Our own crews execute coordinated facade restoration and siding scopes covering:
- Siding repair and full tear-off replacement, stripping warped, storm-loosened or moisture-damaged fiber-cement, engineered composite, metal or vinyl siding on rear walls, setbacks, dormers and courtyards
- EIFS and cement stucco remediation, cutting out wet or impact-punctured lamina and hollow plaster, rebuilding reinforced base coats or three-coat stucco, and recoating weathered elevations
- Substrate and sheathing renewal, replacing soft exterior gypsum or deteriorated wood sheathing uncovered during cladding demolition before new barriers go on
- Masonry-to-cladding transition repairs, resetting loose metal trim, rebuilding failed expansion joints at brick returns and refinishing scarred retail sign bands
Siding removal, drainage planes and replacement detailing
Rear extensions, party-wall offsets and enclosed courtyards in New York City absorb heavy wind-driven rain while getting limited direct sunlight to dry out. When lap boards cup, panel seams open or fasteners pull loose, trapped moisture behind the siding is usually the real problem rather than faded paint. Instead of furring new siding over compromised backup, we strip damaged elevations down to the framing or masonry so rotted sheathing around window sills, exhaust hoods and roof intersections can be rebuilt properly.
Before replacement siding goes up, our crew installs continuous facade waterproofing, sill pan flashings, metal head drip caps and kickout diverters at roof-to-wall terminations. New fiber-cement, metal or composite siding is hung with proper joint clearances, corrosion-resistant fasteners and clean separation above flat roofs, decks and paved yards so standing snow and splash-back do not deteriorate the bottom courses.
Tying restored walls into EIFS, stucco and metal accents
Recurring leaks on renovated urban buildings almost always trace back to neglected material transitions—where replacement siding meets a brick return without backer rod and low-modulus sealant, or where removed storefront signage and old PTAC sleeves left patched rectangles across a street facade. When an owner or developer wants higher thermal performance or a modernized street presence during restoration, our crew transitions directly into full new EIFS installation or architectural aluminum panels under the same contract.
Operated by The Dom Construction Group LLC, our team brings roughly 19 years of field experience in EIFS, stucco, masonry and coatings. We apply the same careful masking, texture matching and schedule control to NYC multi-family and commercial restorations that we brought to our 2026 EIFS canopy refinish at the University at Albany's Casey Stadium, bringing aging elevations back to a clean, uniform plane.
Phasing occupied buildings, scaffold access and NYC permits
Restoring an occupied apartment house, retail strip or commercial building takes disciplined phasing so tenant entries, loading doors and courtyard egress paths stay orderly. Because we own and set our own supported pipe scaffolding, we sequence courtyard, side-yard and street bays around building operations without waiting on third-party rental crews. Every project is backed by general liability, umbrella and workers' compensation insurance.
We are just as direct about New York City regulatory requirements. Call or text (929) 209-3122 to review your facade scope.
NYC facade restoration and siding replacement questions
Can one crew handle EIFS repairs, stucco patching and rear-wall siding replacement together?
Yes. Mixed-material NYC buildings often leak right where rear or courtyard siding meets brick piers, stucco returns or upper EIFS bands. Having our own crew strip and replace damaged siding, rebuild sheathing and flashings, patch stucco or EIFS, and seal transition joints eliminates scheduling gaps and finger-pointing between separate trades.
Do you strip old siding down to the sheathing or install over existing boards?
Where existing siding is warped, loose or letting water in, we strip it down to the framing or masonry backup so soft sheathing, missing rough-opening flashing and rotted trim around windows or roof intersections can be fixed properly before installing a continuous weather barrier and new siding.
Can an older facade be upgraded to continuous-insulation EIFS or metal panels during restoration?
Yes, subject to project design and municipal requirements. When owners or general contractors strip failing siding or deteriorated cladding on commercial and multi-family buildings, our crew can transition directly into drainage EIFS over continuous insulation or architectural aluminum panels and trims.
How do you handle access and NYC permit requirements on occupied building restorations?
We phase work elevation by elevation to keep building entries operating and own our own supported pipe scaffolding for courtyard, side-yard and street access where ground bearing allows.
Send facade photos or renovation drawings for an estimate
Share street and courtyard views plus a quick note on active leaks, loose siding or damaged finishes.
Related envelope and cladding services
- New EIFS & re-cladding
Upgrade stripped or under-insulated elevations with continuous-insulation drainage EIFS.
- Facade waterproofing
Perimeter sealants, parapet waterproofing and breathable coatings integrated into restoration work.
- ACM & aluminum panels
Replace tired storefront sign bands, soffits and fascias with crisp architectural metal.
Planning a multi-material facade turnaround or siding replacement?
Book spring work now. Winter assessments and estimates available.